ITAC Assessment: AR0026
ITAC logo
ITAC Assessment: AR0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Die Cast Watch Cases
NAICS
n/a
SIC 3873: Watches, Clocks, Clockwork Operated Devices, and Parts
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area 273,000
ft2
Annual Production 12,000,000
pieces
Production Hrs. Annual 7,509
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $665,756 10,332,943
kWh
Natural Gas $230,653 86,998
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,088 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,664

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $864 $224 $864
13,482
kWh
- -
02 2.7111: Reduce illumination to minimum necessary levels $5,061 $940 $5,061
78,546
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,747 $862 $3,747
58,030
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,417 $1,000 - $1,417
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,575 $700 $2,575
39,859
kWh
- -
06 2.7245: Use direct air supply to exhaust hoods $18,986 $100 $18,986
288,687
kWh
- -
07 2.4134: Replace electric motor with fossil fuel engine $22,438 $30,500 $37,300
579,132
kWh
$(-8,071.0)
-
MMBtu
$(-6,791.0)
TOTAL RECOMMENDED $55,088 $34,326 $68,533
1,057,736
kWh
$(-6,654.0)
-
MMBtu
$(-6,791.0)
TOTAL IMPLEMENTED $13,664 $3,726 $12,247
189,917
kWh
$1,417
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs