Assessment Year | 1994 |
---|---|
Principal Product | Die Cast Watch Cases |
NAICS |
n/a
|
SIC | 3873: Watches, Clocks, Clockwork Operated Devices, and Parts |
Sales Range | $10 M to 50M |
# of Employees | 350 |
Plant Area |
273,000
ft2
|
Annual Production | 12,000,000
pieces
|
Production Hrs. Annual | 7,509
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $665,756 | 10,332,943 |
kWh
|
$0.064 |
Natural Gas | $230,653 | 86,998 |
MMBtu
|
$2.65 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $55,088 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,664 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $864 | $224 |
$864
13,482
kWh
|
- | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $5,061 | $940 |
$5,061
78,546
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,747 | $862 |
$3,747
58,030
kWh
|
- | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,417 | $1,000 | - |
$1,417
-
MMBtu
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,575 | $700 |
$2,575
39,859
kWh
|
- | - | |
06 | 2.7245: Use direct air supply to exhaust hoods | $18,986 | $100 |
$18,986
288,687
kWh
|
- | - | |
07 | 2.4134: Replace electric motor with fossil fuel engine | $22,438 | $30,500 |
$37,300
579,132
kWh
|
$(-8,071.0)
-
MMBtu
|
$(-6,791.0) | |
TOTAL RECOMMENDED | $55,088 | $34,326 |
$68,533
1,057,736
kWh
|
$(-6,654.0)
-
MMBtu
|
$(-6,791.0) | ||
TOTAL IMPLEMENTED | $13,664 | $3,726 |
$12,247
189,917
kWh
|
$1,417
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs