ITAC Assessment: AM0987
ITAC logo
ITAC Assessment: AM0987
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Downhole Drilling Motor Head
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $100
M
to 500
M
# of Employees 850
Plant Area 304,500
ft2
Annual Production 5,000
pieces
Production Hrs. Annual 4,810
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $778,880 12,117,816
kWh
Electricity Demand $258,381 35,405
kW-mo/yr
Electricity Fees $57,468 -
Natural Gas $64,118 12,037
MMBtu
Waste Disposal Costs
Water Usage $44,168 1,006
Tgal
TOTAL YEARLY COSTS $1,203,015
RECOMMENDED SAVINGS* $347,021 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,131 $960 $9,951
155,491
kWh
$3,180
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,662 $1,120 $1,662
25,974
kWh
- -
03 2.3212: Optimize plant power factor $28,320 $91,366 - $28,320
-
kW-mo/yr
-
04 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $117,908 $1,578,100 $135,095
2,101,008
kWh
$42,981
-
kW-mo/yr
$(-60,168.0)
-
MMBtu
05 2.9114: Use solar heat to make electricty $186,000 $3,361,176 $186,000
2,900,000
kWh
- -
TOTAL RECOMMENDED $347,021 $5,032,722 $332,708
5,182,473
kWh
$74,481
-
kW-mo/yr
$(-60,168.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs