| Assessment Year | 2026 |
|---|---|
| Principal Product | Downhole Drilling Motor Head |
| NAICS | 333132: Oil and Gas Field Machinery and Equipment Manufacturing |
| SIC | 3533: Oil and Gas Field Machinery and Equipment |
| Sales Range | $100 M to 500M |
| # of Employees | 850 |
| Plant Area |
304,500
ft2
|
| Annual Production | 5,000
pieces
|
| Production Hrs. Annual | 4,810
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $778,880 | 12,117,816 |
kWh
|
$0.064 | |
| Electricity Demand | $258,381 | 35,405 |
kW-mo/yr
|
$7.30 | |
| Electricity Fees | $57,468 | - |
|
- | |
| Natural Gas | $64,118 | 12,037 |
MMBtu
|
$5.33 | |
| Waste Disposal Costs | |||||
| Water Usage | $44,168 | 1,006 |
Tgal
|
$43.90 | |
| TOTAL YEARLY COSTS | $1,203,015 | ||||
| RECOMMENDED SAVINGS* | $347,021 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,131 | $960 |
$9,951
155,491
kWh
|
$3,180
-
kW-mo/yr
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,662 | $1,120 |
$1,662
25,974
kWh
|
- | - | |
| 03 | 2.3212: Optimize plant power factor | $28,320 | $91,366 | - |
$28,320
-
kW-mo/yr
|
- | |
| 04 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $117,908 | $1,578,100 |
$135,095
2,101,008
kWh
|
$42,981
-
kW-mo/yr
|
$(-60,168.0)
-
MMBtu
|
|
| 05 | 2.9114: Use solar heat to make electricty | $186,000 | $3,361,176 |
$186,000
2,900,000
kWh
|
- | - | |
| TOTAL RECOMMENDED | $347,021 | $5,032,722 |
$332,708
5,182,473
kWh
|
$74,481
-
kW-mo/yr
|
$(-60,168.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs