ITAC Assessment: AM0908
ITAC logo
ITAC Assessment: AM0908
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Metal coatings
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 47
Plant Area 150,000
ft2
Annual Production 87,000
ton
Production Hrs. Annual 3,140
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $224,145 4,725,900
kWh
Electricity Demand $209,623 18,037
kW-mo/yr
Electricity Fees $17,482 -
Natural Gas $643,322 99,377
MMBtu
TOTAL YEARLY COSTS $1,094,572
RECOMMENDED SAVINGS* $611,599 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $210,130 $2,300,000 $155,680
3,284,400
kWh
$187,630
-
kW-mo/yr
- $(-133,180.0)
-
MMBtu
- - -
02 2.2211: Use optimum temperature $182,340 $400,000 - - - $182,340
-
MMBtu
- - -
03 2.9114: Use solar heat to make electricty $108,000 $1,583,300 $108,000
2,290,000
kWh
- - - - - -
04 4.631: Install an uninteruptable power supply $10,125 $25,600 - - - - - - $10,125
05 2.3212: Optimize plant power factor $47,600 $59,770 - $47,600
-
kW-mo/yr
- - - - -
06 2.2113: Repair or replace steam traps $9,410 $630 - - - $9,410
-
MMBtu
- - -
07 2.8121: Apply for tax-free status for energy purchases $40,900 $8,000 - - - - $8,180 $32,720 -
08 2.8123: Pay utility bills on time $1,283 - - - $1,283 - - - -
09 2.4314: Use synthetic lubricant $1,281 - $566
11,935
kWh
$715
-
kW-mo/yr
- - - - -
10 2.4231: Reduce the pressure of compressed air to the minimum required $530 $15 $220
4,580
kWh
$310
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $611,599 $4,377,315 $264,466
5,590,915
kWh
$236,255
-
kW-mo/yr
$1,283 $58,570
-
MMBtu
$8,180 $32,720 $10,125
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs