ITAC Assessment: AM0742
ITAC logo
ITAC Assessment: AM0742
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Automotive air conditioning units
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 41,000
ft2
Annual Production 23,000
units
Production Hrs. Annual 2,259
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,418 964,032
kWh
Electricity Demand $29,876 3,860
kW-mo/yr
Electricity Fees $868 -
TOTAL YEARLY COSTS $101,162
RECOMMENDED SAVINGS* $15,820 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,830

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,300 - - $9,300
-
kW-mo/yr
02 2.4239: Eliminate or reduce compressed air usage $3,650 $600 $3,650
38,000
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,320 $4,200 $920
9,600
kWh
$400
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $880 $5 $480
5,000
kWh
$400
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $670 $1,200 $470
4,860
kWh
$200
-
kW-mo/yr
TOTAL RECOMMENDED $15,820 $6,005 $5,520
57,460
kWh
$10,300
-
kW-mo/yr
TOTAL IMPLEMENTED $13,830 $605 $4,130
43,000
kWh
$9,700
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs