Assessment Year | 2013 |
---|---|
Principal Product | Lighting fixtures |
NAICS | 335129: Other Lighting Equipment Manufacturing |
SIC | 3648: Lighting Equipment, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 380 |
Plant Area |
292,000
ft2
|
Annual Production | 2,554,090
pieces
|
Production Hrs. Annual | 2,100
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $390,084 | 5,758,400 |
kWh
|
$0.068 |
Electricity Demand | $82,465 | 14,341 |
kW-mo/yr
|
$5.75 |
Electricity Fees | $12,888 | - |
|
- |
Natural Gas | $66,689 | 11,800 |
MMBtu
|
$5.65 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $122,175 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,970 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $49,500 | $242,900 |
$32,100
472,500
kWh
|
$15,500
-
kW-mo/yr
|
- | - | $300 | $1,600 | |
02 | 4.132: Purchase new equipment to reduce material use / cost | $42,430 | $14,500 | - | - | - | - | - | $42,430 | |
03 | 3.4116: Meter recycled water (to reduce sewer charges) | $10,300 | $300 | - | - |
$10,300
-
Tgal
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,470 | $2,800 |
$5,000
73,250
kWh
|
$2,400
-
kW-mo/yr
|
- | - | $70 | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,610 | $2,250 |
$680
10,000
kWh
|
$80
-
kW-mo/yr
|
- | - | $1,100 | $1,750 | |
06 | 2.1117: Relocate oven / furnace to more efficient location | $2,505 | $5,010 |
$1,690
24,845
kWh
|
$815
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,850 | $500 |
$1,920
28,275
kWh
|
$930
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.4239: Eliminate or reduce compressed air usage | $1,470 | $770 |
$1,470
21,600
kWh
|
- | - | - | - | - | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,385 | - |
$935
13,740
kWh
|
$450
-
kW-mo/yr
|
- | - | - | - | |
10 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $440 | - | - | - | - |
$440
-
lb
|
- | - | |
11 | 2.4314: Use synthetic lubricant | $215 | - |
$145
2,136
kWh
|
$70
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $122,175 | $269,030 |
$43,940
646,346
kWh
|
$20,245
-
kW-mo/yr
|
$10,300
-
Tgal
|
$440
-
lb
|
$1,470 | $45,780 | ||
TOTAL IMPLEMENTED | $9,970 | $3,520 |
$5,150
75,751
kWh
|
$1,530
-
kW-mo/yr
|
- |
$440
-
lb
|
$1,100 | $1,750 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs