ITAC Assessment: AM0519
ITAC logo
ITAC Assessment: AM0519
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Enclosed steel trailers
NAICS 336212: Truck Trailer Manufacturing
SIC 3799: Transportation Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 63,000
ft2
Annual Production 3,100
pieces
Production Hrs. Annual 2,146
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,552 619,947
kWh
Electricity Demand $23,806 3,060
kW-mo/yr
Electricity Fees $2,243 -
Natural Gas $26,175 2,386
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,740 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,220

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,100 $15,300 $5,160
40,600
kWh
$1,800
-
kW-mo/yr
- - $140 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,890 $500 $2,900
22,800
kWh
$990
-
kW-mo/yr
- - - -
03 2.8121: Apply for tax-free status for energy purchases $7,500 $3,000 - - $1,500 - - $6,000
04 2.4231: Reduce the pressure of compressed air to the minimum required $770 $14 $570
4,500
kWh
$200
-
kW-mo/yr
- - - -
05 2.7145: Install skylights $900 $1,500 - $1,360
-
kW-mo/yr
- $(-460.0) - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $575 $1,000 $425
3,350
kWh
$150
-
kW-mo/yr
- - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $450 $250 $330
2,600
kWh
$120
-
kW-mo/yr
- - - -
08 2.8123: Pay utility bills on time $280 - - - $280 - - -
09 2.7124: Make a practice of turning off lights when not needed $145 - $145
1,140
kWh
- - - - -
10 2.6212: Turn off equipment during breaks, reduce operating time $130 - $130
1,060
kWh
- - - - -
TOTAL RECOMMENDED $21,740 $21,564 $9,660
76,050
kWh
$4,620
-
kW-mo/yr
$1,780 $(-460.0) $140 $6,000
TOTAL IMPLEMENTED $19,220 $19,050 $8,390
66,000
kWh
$2,910
-
kW-mo/yr
$1,780 - $140 $6,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs