ITAC Assessment: AM0490
ITAC logo
ITAC Assessment: AM0490
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Plastic waterslides
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 300,000
ft2
Annual Production 65,000
lb
Production Hrs. Annual 1,990
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,180 1,496,160
kWh
Electricity Demand $29,232 5,304
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,008 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,533

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $26,530 - $26,530
541,440
kWh
- - - -
02 2.8121: Apply for tax-free status for energy purchases $2,248 $1,124 - - - $2,248 -
03 2.7145: Install skylights $1,430 $220 $1,430
29,140
kWh
- - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $890 $20 $530
10,880
kWh
$360
-
kW-mo/yr
- - -
05 2.7141: Lower light fixtures in high ceiling areas $890 $710 $530
10,770
kWh
$360
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $930 $475 $145
2,940
kWh
$20
-
kW-mo/yr
$765 - -
07 3.7132: Reuse rags until completely soiled $315 - - - - - $315
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $270 $200 $160
3,280
kWh
$110
-
kW-mo/yr
- - -
09 2.7124: Make a practice of turning off lights when not needed $270 $90 $190
3,900
kWh
$80
-
kW-mo/yr
- - -
10 2.7124: Make a practice of turning off lights when not needed $235 $100 $175
3,600
kWh
$60
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $34,008 $2,939 $29,690
605,950
kWh
$990
-
kW-mo/yr
$765 $2,248 $315
TOTAL IMPLEMENTED $32,533 $2,139 $28,970
591,280
kWh
$550
-
kW-mo/yr
$765 $2,248 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs