ITAC Assessment: AM0324
ITAC logo
ITAC Assessment: AM0324
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Architectural metal work, mostly gratings and walkways
NAICS
n/a
SIC 3446: Architectural and Ornamental Metal Work
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 99,000
ft2
Annual Production 0
units
Production Hrs. Annual 5,952
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,913 3,808,910
kWh
Electricity Demand $99,270 16,490
kW-mo/yr
Natural Gas $11,950 2,077
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,240 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,790

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings Primary Product Savings
01 2.3212: Optimize plant power factor $28,430 $104,000 - $28,430
-
kW-mo/yr
- - - -
02 4.652: Replace existing equipment with more suitable substitutes $21,000 $500 - - - - - $21,000
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,800 $1,500 $4,800
105,510
kWh
- - - - -
04 3.8132: Use less toxic and volatile solvent substitutes $1,840 $3,300 - - $1,840
-
gal
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,630 - $1,630
36,342
kWh
- - - - -
06 2.4314: Use synthetic lubricant $1,020 - $760
16,999
kWh
$260
-
kW-mo/yr
- - - -
07 3.6192: Use a less expensive method of waste removal $960 - - - - - $960 -
08 2.7121: Utilize daylight whenever possible in lieu of artificial light $820 - $820
42,497
kWh
- - - - -
09 2.4133: Use most efficient type of electric motors $590 $1,310 $440
9,965
kWh
$150
-
kW-mo/yr
- - - -
10 3.7198: Reduce / eliminate use of disposable product $150 $165 - - - $150
-
lb
- -
TOTAL RECOMMENDED $61,240 $110,775 $8,450
211,313
kWh
$28,840
-
kW-mo/yr
$1,840
-
gal
$150
-
lb
$960 $21,000
TOTAL IMPLEMENTED $55,790 $107,475 $6,060
157,972
kWh
$28,580
-
kW-mo/yr
- $150
-
lb
- $21,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs