ITAC Assessment: AM0309
ITAC logo
ITAC Assessment: AM0309
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Carbon steel pipe
NAICS
n/a
SIC 3317: Steel Pipe and Tubes
Sales Range $50
M
to 100
M
# of Employees 130
Plant Area 268,000
ft2
Annual Production 96,000
ton
Production Hrs. Annual 4,769
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $363,248 9,011,137
kWh
Electricity Demand $226,098 36,725
kW-mo/yr
Electricity Fees $3,262 -
Natural Gas $20,159 3,854
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $171,087 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $95,317

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (haz) Savings Administrative Changes Savings Primary Product Savings
01 4.611: Begin a practice of predictive / preventative maintenance $75,170 $4,200 $2,780
63,892
kWh
- - $72,390
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $81,500 $9,300 $81,500
1,812,720
kWh
- - -
03 3.8132: Use less toxic and volatile solvent substitutes $12,480 $9,270 - $12,480
-
gal
- -
04 2.8123: Pay utility bills on time $1,337 - - - $1,337 -
05 2.4314: Use synthetic lubricant $600 - $600
13,189
kWh
- - -
TOTAL RECOMMENDED $171,087 $22,770 $84,880
1,889,801
kWh
$12,480
-
gal
$1,337 $72,390
TOTAL IMPLEMENTED $95,317 $18,570 $81,500
1,812,720
kWh
$12,480
-
gal
$1,337 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs