ITAC Assessment: AM0287
ITAC logo
ITAC Assessment: AM0287
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Oilfield service equipment
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 128,800
ft2
Annual Production 7,200
pieces
Production Hrs. Annual 8,208
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $273,343 5,084,994
kWh
Electricity Demand $71,937 11,158
kW-mo/yr
Electricity Fees $29,023 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,230 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,890

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.3134: Shift from daytime to nighttime operation $13,800 - - $13,800
-
kW-mo/yr
- - - -
02 2.8123: Pay utility bills on time $4,280 - - - $4,280 - - -
03 2.7124: Make a practice of turning off lights when not needed $1,490 - $490
22,274
kWh
$1,000
-
kW-mo/yr
- - - -
04 4.211: Consider use / purchase of bulk materials where possible $1,300 - - - - - - $1,300
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $680 $300 $680
31,067
kWh
- - - - -
06 3.6194: Ship hydraulic oil to secondary fuel program $240 - - - - $240
-
gal
- -
07 3.5248: Separate and recycle scrap metal to foundry or for sale $440 - - - - - $440
-
lb
-
TOTAL RECOMMENDED $22,230 $300 $1,170
53,341
kWh
$14,800
-
kW-mo/yr
$4,280 $240
-
gal
$440
-
lb
$1,300
TOTAL IMPLEMENTED $6,890 $300 $1,170
53,341
kWh
$1,000
-
kW-mo/yr
$4,280 - $440
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs