Assessment Year | 1991 |
---|---|
Principal Product | IRON CASTINGS |
NAICS |
n/a
|
SIC | 3322: Malleable Iron Foundries |
Sales Range | $10 M to 50M |
# of Employees | 700 |
Plant Area |
n/a
|
Annual Production | 47,000
ton
|
Production Hrs. Annual | 7,130
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $3,056,035 | 76,386,285 |
kWh
|
$0.040 |
Natural Gas | $484,057 | 260,058 |
MMBtu
|
$1.86 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $731,845 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $731,845 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.8122: Use utility controlled power management | $687,000 | $250,000 |
$687,000
-
kWh
|
- | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $34,390 | $88,900 |
$(-2,410.0)
(-35,170)
kWh
|
$36,800
-
MMBtu
|
|
03 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $7,300 | $280 | - |
$7,300
-
MMBtu
|
|
04 | 2.1122: Re-size charging openings or add a movable door on equipment | $2,815 | $400 | - |
$2,815
-
MMBtu
|
|
05 | 2.2511: Insulate bare equipment | $340 | $290 | - |
$340
-
MMBtu
|
|
TOTAL RECOMMENDED | $731,845 | $339,870 |
$684,590
(-35,170)
kWh
|
$47,255
-
MMBtu
|
||
TOTAL IMPLEMENTED | $731,845 | $339,870 |
$684,590
(-35,170)
kWh
|
$47,255
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs