Assessment Year | 1987 |
---|---|
Principal Product | BUSINESS FORMS |
NAICS |
n/a
|
SIC | 2761: Manifold Business Forms |
Sales Range | $10 M to 50M |
# of Employees | 156 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,250
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $267,702 | 4,867,233 |
kWh
|
$0.055 |
Natural Gas | $70,657 | 19,338 |
MMBtu
|
$3.65 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $109,532 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $108,889 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $11,479 | $5,500 |
$11,479
260,844
kWh
|
- | |
02 | 2.7226: Use computer programs to optimize hvac performance | $95,084 | $60,000 |
$52,212
1,077,960
kWh
|
$42,872
-
MMBtu
|
|
03 | 2.6212: Turn off equipment during breaks, reduce operating time | $205 | - |
$205
4,689
kWh
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $643 | $3,224 |
$643
14,654
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $657 | $1,972 |
$657
8,499
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $154 | $332 |
$154
2,052
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,175 | $2,533 |
$1,175
15,533
kWh
|
- | |
08 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $58 | $97 |
$58
1,465
kWh
|
- | |
09 | 2.7111: Reduce illumination to minimum necessary levels | $77 | $18 |
$77
1,758
kWh
|
- | |
TOTAL RECOMMENDED | $109,532 | $73,676 |
$66,660
1,387,454
kWh
|
$42,872
-
MMBtu
|
||
TOTAL IMPLEMENTED | $108,889 | $70,452 |
$66,017
1,372,800
kWh
|
$42,872
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs