ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

1,387

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $712k 137k
MMBtu
$7.09
- Electrical $375k 7,836k
kWh
$0.15
- Natural Gas $221k 51k
MMBtu
$5.01

10,037

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $64k 6.2k
MMBtu
4.6%
- Electrical $34k 608k
kWh
7.8%
- Natural Gas $13k -
MMBtu
-
Waste $8.5k
Productivity/Other $50k
TOTAL $122k
*May be negative reflecting an increased cost component required to save energy and costs overall

1,291

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $740k 143k
MMBtu
$6.90
- Electrical $389k 8,156k
kWh
$0.16
- Natural Gas $234k 55k
MMBtu
$4.75

5,412

Implemented Recommendations

4.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 3.1k
MMBtu
2.1%
- Electrical $17k 299k
kWh
3.7%
- Natural Gas $7.3k -
MMBtu
-
Waste $3.7k
Productivity/Other $18k
TOTAL $55k
*May be negative reflecting an increased cost component required to save energy and costs overall