ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

629

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $789k 210k
MMBtu
$5.72
- Electrical $436k 10,098k
kWh
$0.083
- Natural Gas $188k 56k
MMBtu
$4.47

3,715

Recommendations

5.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $73k 9.3k
MMBtu
4.4%
- Electrical $45k 908k
kWh
9.0%
- Natural Gas $10.0k -
MMBtu
-
Waste $12k
Productivity/Other $123k
TOTAL $207k
*May be negative reflecting an increased cost component required to save energy and costs overall

612

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $795k 214k
MMBtu
$5.58
- Electrical $441k 10,268k
kWh
$0.083
- Natural Gas $190k 57k
MMBtu
$4.40

1,773

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 3.2k
MMBtu
1.5%
- Electrical $14k 309k
kWh
3.0%
- Natural Gas $5.1k -
MMBtu
-
Waste $4.9k
Productivity/Other $42k
TOTAL $75k
*May be negative reflecting an increased cost component required to save energy and costs overall