ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products

588

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,652k 294k
MMBtu
$8.55
- Electrical $732k 12,917k
kWh
$0.077
- Natural Gas $767k 142k
MMBtu
$4.51

3,638

Recommendations

6.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $191k 13k
MMBtu
4.4%
- Electrical $75k 1,267k
kWh
9.8%
- Natural Gas $101k -
MMBtu
-
Waste $6.6k
Productivity/Other $24k
TOTAL $222k
*May be negative reflecting an increased cost component required to save energy and costs overall

533

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,765k 316k
MMBtu
$8.16
- Electrical $777k 13,843k
kWh
$0.076
- Natural Gas $837k 156k
MMBtu
$4.38

1,761

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $66k 4.9k
MMBtu
1.5%
- Electrical $30k 476k
kWh
3.4%
- Natural Gas $28k -
MMBtu
-
Waste $2.1k
Productivity/Other $6.8k
TOTAL $74k
*May be negative reflecting an increased cost component required to save energy and costs overall