Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,040

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1089 #05 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $10,107 $2,128
OK1089 #04 Y:2023 Reduce the pressure of compressed air to the minimum required $2,067 -
OK1089 #03 Y:2023 Clean and maintain refrigerant condensers and towers $4,600 $2,921
OK1089 #02 Y:2023 Replace existing hvac unit with high efficiency model $2,905 $14,300
OK1089 #01 Y:2023 Analyze flue gas for proper air/fuel ratio $5,064 $22,000
MI0424 #06 Y:2023 Install vinyl strip / high speed / air curtain doors $375 $1,215
MI0424 #05 Y:2023 Close holes and openings in building such as broken windows $2,147 $118
MI0424 #04 Y:2023 Lower temperature during the winter season and vice-versa $4,786 $580
MI0424 #03 Y:2023 Turn off equipment when not in use $5,328 -
MI0424 #02 Y:2023 Change rate schedules or other changes in utility service $6,951 $120
MI0424 #01 Y:2023 Increase efficiency of trucks $32,721 $6,400
MA0857 #04 Y:2023 Change procedures / equipment / operating conditions $200 $131
MA0857 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $481 $192
MA0857 #02 Y:2023 Reduce space conditioning during non-working hours $2,193 $200
MA0857 #01 Y:2023 Use solar heat to make electricty $93,363 $714,951
IC0279 #11 Y:2023 Repair and eliminate steam leaks $10,359 $750
IC0279 #10 Y:2023 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $610,617 $3,463,096
IC0279 #09 Y:2023 Use solar heat to make electricty $159,499 $2,716,228
IC0279 #08 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $58,649 $36,118
IC0279 #07 Y:2023 Operate boilers on high fire setting $3,858 $72