Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,546

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0164 #05 Y:2019 Use radiant heater for spot heating $245 $540
UU0164 #04 Y:2019 Improve air circulation with destratification fans / other methods $750 $750
UU0164 #03 Y:2019 Install outside air damper / economizer on hvac unit $865 $2,038
UU0164 #02 Y:2019 Turn off equipment when not in use $1,660 $500
UU0164 #01 Y:2019 Lower temperature during the winter season and vice-versa $4,252 $2,000
MZ0281 #04 Y:2019 Analyze flue gas for proper air/fuel ratio $2,486 $720
MZ0281 #03 Y:2019 Install occupancy sensors $98 $250
MZ0281 #02 Y:2019 Install spectral reflectors / delamp $1,877 $396
MZ0281 #01 Y:2019 Use heat in flue gases to preheat products or materials $22,302 $48,220
LE0495 #06 Y:2019 Utilize higher efficiency lamps and/or ballasts $4,587 $20,636
LE0495 #05 Y:2019 Utilize energy-efficient belts and other improved mechanisms $122 $360
LE0495 #04 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $1,360 $1,375
LE0495 #03 Y:2019 Turn off equipment during breaks, reduce operating time $1,226 $270
LE0495 #02 Y:2019 Install timers and/or thermostats $2,183 $360
LE0495 #01 Y:2019 Reduce the pressure of compressed air to the minimum required $1,065 $40
MA0816 #04 Y:2019 Change procedures / equipment / operating conditions $493 $100
MA0816 #03 Y:2019 Utilize higher efficiency lamps and/or ballasts $917 $4,629
MA0816 #02 Y:2019 Shift from daytime to nighttime operation $3,363 $3,000
MA0816 #01 Y:2019 Use solar heat to make electricty $66,795 $292,241
IC0237 #07 Y:2019 Utilize energy-efficient belts and other improved mechanisms $628 $200