Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,591

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0310 #06 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $5,522 $1,660
MI0310 #05 Y:2017 Change rate schedules or other changes in utility service $9,210 $2,400
MI0310 #04 Y:2017 Lower temperature during the winter season and vice-versa $14,676 $640
MI0310 #03 Y:2017 Utilize higher efficiency lamps and/or ballasts $15,634 $87,759
MI0310 #02 Y:2017 Turn off equipment when not in use $26,938 $3,600
MI0310 #01 Y:2017 Utilize a less expensive cooling method $66,228 $330,000
UF0506 #07 Y:2017 Re-arrange equipment layout to reduce handling costs $60,000 $55,338
UF0506 #06 Y:2017 Install set-back timers $1,014 $667
UF0506 #05 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $2,010 $6,500
UF0506 #04 Y:2017 Utilize controls to operate equipment only when needed $2,070 $1,171
UF0506 #03 Y:2017 Install common header on compressors $4,067 $3,216
UF0506 #02 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $4,519 $1,169
UF0506 #01 Y:2017 Use most efficient type of electric motors $5,263 $5,454
LS0003 #06 Y:2017 Modify facility to avoid excess maintenance costs $1,200 -
LS0003 #05 Y:2017 Insulate bare equipment $12,478 -
LS0003 #04 Y:2017 Utilize energy-efficient belts and other improved mechanisms $1,982 -
LS0003 #03 Y:2017 Make a practice of turning off lights when not needed $1,869 -
LS0003 #02 Y:2017 Reduce illumination to minimum necessary levels $1,307 -
LS0003 #01 Y:2017 Install desiccant humidity control system $17,595 -
GT0898 #05 Y:2017 Use solar heat for heat $42,901 $150,153