Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,649

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0307 #14 Y:2016 Lower temperature during the winter season and vice-versa $359 $40
MI0307 #13 Y:2016 Lower temperature during the winter season and vice-versa $692 $240
MI0307 #12 Y:2016 Use photocell controls $840 $600
MI0307 #11 Y:2016 Eliminate or reduce compressed air usage $845 $1,450
MI0307 #10 Y:2016 Convert from batch to continuous operation $1,137 $800
MI0307 #09 Y:2016 Recover waste heat from equipment $1,516 $8,584
MI0307 #08 Y:2016 Use properly designed and sized hvac equipment $1,536 $3,370
MI0307 #07 Y:2016 Clean or color roof to reduce solar load $2,323 $1,720
MI0307 #06 Y:2016 Utilize controls to operate equipment only when needed $2,403 $842
MI0307 #05 Y:2016 Install occupancy sensors $2,611 $6,150
MI0307 #04 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $4,347 $1,660
MI0307 #03 Y:2016 Utilize higher efficiency lamps and/or ballasts $8,777 $23,135
MI0307 #02 Y:2016 Utilize a less expensive cooling method $10,877 $56,000
MI0307 #01 Y:2016 Turn off equipment when not in use $12,345 $3,600
MA0771 #03 Y:2016 Improve air circulation with destratification fans / other methods $527 $2,116
MA0771 #02 Y:2016 Optimize plant power factor $8,733 $3,480
MA0771 #01 Y:2016 Establish a predictive maintenance program $13,141 $1,000
IP0081 #10 Y:2016 Replace air curtain doors with solid doors $1,766 $3,788
IP0081 #09 Y:2016 Install occupancy sensors $201 $409
IP0081 #08 Y:2016 Utilize higher efficiency lamps and/or ballasts $832 $1,358