Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,240

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK0933 #04 Y:2015 Utilize controls to operate equipment only when needed $3,259 -
OK0933 #03 Y:2015 Utilize higher efficiency lamps and/or ballasts $1,485 $7,280
OK0933 #02 Y:2015 Utilize higher efficiency lamps and/or ballasts $4,290 $20,770
OK0933 #01 Y:2015 Utilize higher efficiency lamps and/or ballasts $32,999 $48,276
OK0936 #04 Y:2015 Reduce space conditioning during non-working hours $144 $316
OK0936 #03 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $323 $450
OK0936 #02 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $27,106 $35,525
OK0936 #01 Y:2015 Optimize plant power factor $46,436 $29,439
UA0154 #06 Y:2015 Utilize energy-efficient belts and other improved mechanisms $175 $120
UA0154 #05 Y:2015 Use photocell controls $414 $664
UA0154 #04 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $566 $2,045
UA0154 #03 Y:2015 Insulate glazing, walls, ceilings, and roofs $201 $508
UA0154 #02 Y:2015 Recycle air for heating, ventilation and air conditioning $1,116 $1,660
UA0154 #01 Y:2015 Modify startup/shutdown times $3,959 -
LE0413 #08 Y:2015 Replace electrically-operated equipment with fossil fuel equipment $5,559 $14,000
LE0413 #07 Y:2015 Use cooling tower or economizer to replace chiller cooling $13,462 $25,000
LE0413 #06 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $8,404 $15,000
LE0413 #05 Y:2015 Install timers and/or thermostats $482 $590
LE0413 #04 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $973 $1,000
LE0413 #03 Y:2015 Recover waste heat from equipment $3,060 $1,800