4,240
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0523 #08 Y:2015 | 08 | 2015 | Replace obsolete burners with more efficient ones | $654 | $2,700 | |
| WV0523 #07 Y:2015 | 07 | 2015 | Analyze flue gas for proper air/fuel ratio | $1,154 | $500 | |
| WV0523 #06 Y:2015 | 06 | 2015 | Utilize higher efficiency lamps and/or ballasts | $1,279 | $4,985 | |
| WV0523 #05 Y:2015 | 05 | 2015 | Develop a repair/replace policy | $2,819 | $1,235 | |
| WV0523 #04 Y:2015 | 04 | 2015 | Utilize higher efficiency lamps and/or ballasts | $4,867 | $2,686 | |
| WV0523 #03 Y:2015 | 03 | 2015 | Utilize higher efficiency lamps and/or ballasts | $5,412 | $4,664 | |
| WV0523 #02 Y:2015 | 02 | 2015 | Use adjustable frequency drive or multiple speed motors on existing system | $13,250 | $51,000 | |
| WV0523 #01 Y:2015 | 01 | 2015 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $51,512 | $200,000 | |
| TT0171 #07 Y:2015 | 07 | 2015 | Use adjustable frequency drive or multiple speed motors on existing system | $676 | $1,366 | |
| TT0171 #06 Y:2015 | 06 | 2015 | Eliminate or reduce compressed air usage | $544 | $1,100 | |
| TT0171 #05 Y:2015 | 05 | 2015 | Upgrade controls on compressors | $2,435 | $800 | |
| TT0171 #04 Y:2015 | 04 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,210 | - | |
| TT0171 #03 Y:2015 | 03 | 2015 | Use computer programs to optimize hvac performance | $11,200 | $110,000 | |
| TT0171 #02 Y:2015 | 02 | 2015 | Clean or color roof to reduce solar load | $16,670 | $105,000 | |
| TT0171 #01 Y:2015 | 01 | 2015 | Utilize higher efficiency lamps and/or ballasts | $49,961 | $156,286 | |
| MA0754 #08 Y:2015 | 08 | 2015 | Replace electric motor with fossil fuel engine | $1,151 | $500 | |
| MA0754 #07 Y:2015 | 07 | 2015 | Use adjustable frequency drive or multiple speed motors on existing system | $6,913 | $4,940 | |
| MA0754 #06 Y:2015 | 06 | 2015 | Use adjustable frequency drive or multiple speed motors on existing system | $25,043 | $13,895 | |
| MA0754 #05 Y:2015 | 05 | 2015 | Meter recycled water (to reduce sewer charges) | $34,769 | $3,000 | |
| MA0754 #04 Y:2015 | 04 | 2015 | Increase amount of condensate returned | $62,104 | $250,000 |