| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NC0535 #01 Y:2014 | 01 | 2014 | Utilize higher efficiency lamps and/or ballasts | $1,964 | $9,077 | |
| IP0033 #09 Y:2014 | 09 | 2014 | Replace air curtain doors with solid doors | $6,096 | $25,603 | |
| IP0033 #08 Y:2014 | 08 | 2014 | Optimize plant power factor | $4,939 | $10,200 | |
| IP0033 #07 Y:2014 | 07 | 2014 | Size electric motors for peak operating efficiency | $1,865 | $3,720 | |
| IP0033 #06 Y:2014 | 06 | 2014 | Utilize higher efficiency lamps and/or ballasts | $2,018 | $3,232 | |
| IP0033 #05 Y:2014 | 05 | 2014 | Install compressor air intakes in coolest locations | $1,961 | $1,864 | |
| IP0033 #04 Y:2014 | 04 | 2014 | Use batch firing with kiln "furniture" specifically designed | $4,925 | $3,000 | |
| IP0033 #03 Y:2014 | 03 | 2014 | Use or replace with energy efficient substitutes | $520 | $144 | |
| IP0033 #02 Y:2014 | 02 | 2014 | Install occupancy sensors | $1,742 | $240 | |
| IP0033 #01 Y:2014 | 01 | 2014 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,557 | - | |
| CO0700 #05 Y:2014 | 05 | 2014 | Improve air circulation with destratification fans / other methods | $540 | $1,820 | |
| CO0700 #04 Y:2014 | 04 | 2014 | Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $4,840 | $15,500 | |
| CO0700 #03 Y:2014 | 03 | 2014 | Utilize higher efficiency lamps and/or ballasts | $16,950 | $82,280 | |
| CO0700 #02 Y:2014 | 02 | 2014 | Turn off equipment when not in use | $4,710 | - | |
| CO0700 #01 Y:2014 | 01 | 2014 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,900 | $1,270 | |
| MI0274 #14 Y:2014 | 14 | 2014 | Install timers on light switches in little used areas | $253 | $320 | |
| MI0274 #13 Y:2014 | 13 | 2014 | Insulate bare equipment | $320 | $310 | |
| MI0274 #12 Y:2014 | 12 | 2014 | Reduce illumination to minimum necessary levels | $457 | $160 | |
| MI0274 #11 Y:2014 | 11 | 2014 | Use optimum thickness insulation | $626 | $360 | |
| MI0274 #10 Y:2014 | 10 | 2014 | Meter recycled water (to reduce sewer charges) | $1,145 | $780 |