Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,666

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0035 #01 Y:2014 Install set-back timers $9,953 -
DL0140 #06 Y:2014 Use waste heat from hot flue gases to preheat $25,660 $74,190
DL0140 #05 Y:2014 Install occupancy sensors $3,810 $1,640
DL0140 #04 Y:2014 Utilize higher efficiency lamps and/or ballasts $60,305 $98,895
DL0140 #03 Y:2014 Use or replace with energy efficient substitutes $5,235 $3,000
DL0140 #02 Y:2014 Recover waste heat from equipment $16,140 $5,060
DL0140 #01 Y:2014 Reduce ventilation air $169,710 -
WM0063 #08 Y:2014 Use or replace with energy efficient substitutes $57,847 $55,000
WM0063 #07 Y:2014 Insulate bare equipment $1,484 $603
WM0063 #06 Y:2014 Turn off equipment during breaks, reduce operating time $85 -
WM0063 #05 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $22,548 $52,000
WM0063 #04 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $8,305 $5,750
WM0063 #03 Y:2014 Install occupancy sensors $2,876 $2,860
WM0063 #02 Y:2014 Utilize higher efficiency lamps and/or ballasts $1,045 $1,800
WM0063 #01 Y:2014 Utilize higher efficiency lamps and/or ballasts $171 $294
UD0921 #12 Y:2014 Clean fouling from water lines regularly $4,725 $11,000
UD0921 #11 Y:2014 Utilize daylight whenever possible in lieu of artificial light $2,030 $6,052
UD0921 #10 Y:2014 Insulate bare equipment $3,379 $8,000
UD0921 #09 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $1,190 $4,300
UD0921 #08 Y:2014 Turn off equipment during breaks, reduce operating time $1,618 $700