3,666
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0503 #07 Y:2014 | 07 | 2014 | Establish a predictive maintenance program | $915 | $1,000 | |
| WV0503 #06 Y:2014 | 06 | 2014 | Utilize higher efficiency lamps and/or ballasts | $2,499 | $3,530 | |
| WV0503 #05 Y:2014 | 05 | 2014 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,831 | $374 | |
| WV0503 #04 Y:2014 | 04 | 2014 | Analyze flue gas for proper air/fuel ratio | $2,899 | $500 | |
| WV0503 #03 Y:2014 | 03 | 2014 | Use demand controller or load shedder | $2,630 | $5,700 | |
| WV0503 #02 Y:2014 | 02 | 2014 | Use or replace with energy efficient substitutes | $6,444 | $22,500 | |
| WV0503 #01 Y:2014 | 01 | 2014 | Utilize higher efficiency lamps and/or ballasts | $7,355 | $27,692 | |
| BS0050 #03 Y:2014 | 03 | 2014 | Utilize energy-efficient belts and other improved mechanisms | $143 | $60 | |
| BS0050 #02 Y:2014 | 02 | 2014 | Install occupancy sensors | $750 | $660 | |
| BS0050 #01 Y:2014 | 01 | 2014 | Use adjustable frequency drive or multiple speed motors on existing system | $89,269 | $87,200 | |
| WV0502 #10 Y:2014 | 10 | 2014 | Utilize higher efficiency lamps and/or ballasts | $321 | $854 | |
| WV0502 #09 Y:2014 | 09 | 2014 | Insulate bare equipment | $812 | $2,934 | |
| WV0502 #08 Y:2014 | 08 | 2014 | Analyze flue gas for proper air/fuel ratio | $1,826 | $500 | |
| WV0502 #07 Y:2014 | 07 | 2014 | Develop a repair/replace policy | $3,350 | $724 | |
| WV0502 #06 Y:2014 | 06 | 2014 | Optimize plant power factor | $3,830 | $16,400 | |
| WV0502 #05 Y:2014 | 05 | 2014 | Modify refrigeration system to operate at a lower pressure | $6,333 | $2,500 | |
| WV0502 #04 Y:2014 | 04 | 2014 | Use adjustable frequency drive or multiple speed motors on existing system | $6,838 | $20,000 | |
| WV0502 #03 Y:2014 | 03 | 2014 | Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $12,681 | $18,000 | |
| WV0502 #02 Y:2014 | 02 | 2014 | Utilize higher efficiency lamps and/or ballasts | $13,334 | $25,930 | |
| WV0502 #01 Y:2014 | 01 | 2014 | Establish a predictive maintenance program | $13,685 | $1,000 |