Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,105

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IA0498 #04 Y:2013 Optimize plant power factor $5,092 $3,443
IA0498 #03 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $753 $660
IA0498 #02 Y:2013 Install occupancy sensors $901 $525
IA0498 #01 Y:2013 Lower light fixtures in high ceiling areas $2,917 $9,898
BS0017 #06 Y:2013 Minimize operation of equipment maintained in standby condition $2,115 $2,167
BS0017 #05 Y:2013 Use proper thickness of insulation on building envelope $998 $1,134
BS0017 #04 Y:2013 Install occupancy sensors $207 $48
BS0017 #03 Y:2013 Install soft-start to eliminate nuisance trips $1,029 $4,500
BS0017 #02 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $391 $977
BS0017 #01 Y:2013 Install compressor air intakes in coolest locations $268 $182
UM0422 #03 Y:2013 Replace hydraulic / pneumatic equipment with electric equipment $29,593 $14,120
UM0422 #02 Y:2013 Install compressor air intakes in coolest locations $2,633 $500
UM0422 #01 Y:2013 Utilize higher efficiency lamps and/or ballasts $31,550 $15,331
MZ0120 #05 Y:2013 Use compressor air filters $4,675 $1,100
MZ0120 #04 Y:2013 Install occupancy sensors $153 $190
MZ0120 #03 Y:2013 Replace existing chiller with high efficiency model $8,557 $31,200
MZ0120 #02 Y:2013 Use heat in flue gases to preheat products or materials $35,241 $75,000
MZ0120 #01 Y:2013 Use most efficient type of electric motors $28,136 $119,770
IA0497 #07 Y:2013 Turn off equipment when not in use $7,000 $7,560
IA0497 #06 Y:2013 Recover waste heat from equipment $1,468 $1,500