Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,122

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0891 #03 Y:2011 Install / repair insulation on steam lines $610 $225
GT0891 #02 Y:2011 Turn off equipment when not in use $304 -
GT0891 #01 Y:2011 Use synthetic lubricant $14,552 -
NC0445 #06 Y:2011 Utilize higher efficiency lamps and/or ballasts $1,698 $7,891
NC0445 #05 Y:2011 Utilize higher efficiency lamps and/or ballasts $336 $126
NC0445 #04 Y:2011 Use waste heat to produce steam to drive a steam turbine-generator $17,271 $73,750
NC0445 #03 Y:2011 Recover waste heat from equipment $1,573 $7,197
NC0445 #02 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $575 $100
NC0445 #01 Y:2011 Reduce the pressure of compressed air to the minimum required $1,196 -
LE0332 #10 Y:2011 Utilize higher efficiency lamps and/or ballasts $706 $4,580
LE0332 #09 Y:2011 Use adjustable frequency drive or multiple speed motors on existing system $3,360 $6,400
LE0332 #08 Y:2011 Reduce the pressure of compressed air to the minimum required $3,829 $40
LE0332 #07 Y:2011 Develop standard operating procedures $6,689 -
LE0332 #06 Y:2011 Install vinyl strip / high speed / air curtain doors $7,328 $23,400
LE0332 #05 Y:2011 Use / purchase optimum sized compressor $8,856 $28,000
LE0332 #04 Y:2011 Install occupancy sensors $9,659 $24,370
LE0332 #03 Y:2011 Improve air circulation with destratification fans / other methods $12,677 $25,375
LE0332 #02 Y:2011 Minimize use of outside make-up air for ventilation except when used for economizer cycle $16,976 $7,660
LE0332 #01 Y:2011 Use solar heat to make electricty $66,813 -
UD0850 #11 Y:2011 Interlock heating and air conditioning systems to prevent simultaneous operation $89 $145