3,122
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| GT0891 #03 Y:2011 | 03 | 2011 | Install / repair insulation on steam lines | $610 | $225 | |
| GT0891 #02 Y:2011 | 02 | 2011 | Turn off equipment when not in use | $304 | - | |
| GT0891 #01 Y:2011 | 01 | 2011 | Use synthetic lubricant | $14,552 | - | |
| NC0445 #06 Y:2011 | 06 | 2011 | Utilize higher efficiency lamps and/or ballasts | $1,698 | $7,891 | |
| NC0445 #05 Y:2011 | 05 | 2011 | Utilize higher efficiency lamps and/or ballasts | $336 | $126 | |
| NC0445 #04 Y:2011 | 04 | 2011 | Use waste heat to produce steam to drive a steam turbine-generator | $17,271 | $73,750 | |
| NC0445 #03 Y:2011 | 03 | 2011 | Recover waste heat from equipment | $1,573 | $7,197 | |
| NC0445 #02 Y:2011 | 02 | 2011 | Eliminate leaks in inert gas and compressed air lines/ valves | $575 | $100 | |
| NC0445 #01 Y:2011 | 01 | 2011 | Reduce the pressure of compressed air to the minimum required | $1,196 | - | |
| LE0332 #10 Y:2011 | 10 | 2011 | Utilize higher efficiency lamps and/or ballasts | $706 | $4,580 | |
| LE0332 #09 Y:2011 | 09 | 2011 | Use adjustable frequency drive or multiple speed motors on existing system | $3,360 | $6,400 | |
| LE0332 #08 Y:2011 | 08 | 2011 | Reduce the pressure of compressed air to the minimum required | $3,829 | $40 | |
| LE0332 #07 Y:2011 | 07 | 2011 | Develop standard operating procedures | $6,689 | - | |
| LE0332 #06 Y:2011 | 06 | 2011 | Install vinyl strip / high speed / air curtain doors | $7,328 | $23,400 | |
| LE0332 #05 Y:2011 | 05 | 2011 | Use / purchase optimum sized compressor | $8,856 | $28,000 | |
| LE0332 #04 Y:2011 | 04 | 2011 | Install occupancy sensors | $9,659 | $24,370 | |
| LE0332 #03 Y:2011 | 03 | 2011 | Improve air circulation with destratification fans / other methods | $12,677 | $25,375 | |
| LE0332 #02 Y:2011 | 02 | 2011 | Minimize use of outside make-up air for ventilation except when used for economizer cycle | $16,976 | $7,660 | |
| LE0332 #01 Y:2011 | 01 | 2011 | Use solar heat to make electricty | $66,813 | - | |
| UD0850 #11 Y:2011 | 11 | 2011 | Interlock heating and air conditioning systems to prevent simultaneous operation | $89 | $145 |