Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,332

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0049 #08 Y:2010 Eliminate or reduce compressed air usage $2,410 $2,800
MZ0049 #07 Y:2010 Turn off equipment when not in use $217 $150
MZ0049 #06 Y:2010 Utilize higher efficiency lamps and/or ballasts $3,075 $3,960
MZ0049 #05 Y:2010 Install occupancy sensors $5,075 $6,650
MZ0049 #04 Y:2010 Use proper thickness of insulation on building envelope $180 $170
MZ0049 #03 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $19,012 -
MZ0049 #02 Y:2010 Reduce the pressure of compressed air to the minimum required $2,416 -
MZ0049 #01 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $823 $300
MA0663 #05 Y:2010 Reduce the pressure of compressed air to the minimum required $900 $200
MA0663 #04 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $938 $600
MA0663 #03 Y:2010 Use cooling tower or economizer to replace chiller cooling $4,990 $21,410
MA0663 #02 Y:2010 Replace existing chiller with high efficiency model $10,239 $24,000
MA0663 #01 Y:2010 Use waste heat from hot flue gases to preheat $22,896 $90,000
DL0050 #05 Y:2010 Utilize higher efficiency lamps and/or ballasts $9,850 $34,600
DL0050 #04 Y:2010 Cover open tanks $263 $275
DL0050 #03 Y:2010 Install set-back timers $1,236 $300
DL0050 #02 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $3,070 $300
DL0050 #01 Y:2010 Reduce the pressure of compressed air to the minimum required $1,623 $100
NC0404 #04 Y:2010 Utilize higher efficiency lamps and/or ballasts $4,935 $40
NC0404 #03 Y:2010 Install occupancy sensors $435 $1,890