Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,123

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UM0334 #02 Y:2007 Use waste heat from hot flue gases to preheat $1,418 $4,000
UM0334 #01 Y:2007 Utilize higher efficiency lamps and/or ballasts $6,003 $25,980
MI0163 #05 Y:2007 Install vinyl strip / high speed / air curtain doors $1,968 $2,151
MI0163 #04 Y:2007 Utilize higher efficiency lamps and/or ballasts $3,724 $11,286
MI0163 #03 Y:2007 Insulate bare equipment $4,023 $1,957
MI0163 #02 Y:2007 Clean or color roof to reduce solar load $10,234 $48,055
MI0163 #01 Y:2007 Install partitions to reduce size of conditioned space $600,000 $200,000
WV0372 #10 Y:2007 Install compressor air intakes in coolest locations $1,153 $460
WV0372 #09 Y:2007 Utilize higher efficiency lamps and/or ballasts $1,523 -
WV0372 #08 Y:2007 Eliminate or reduce compressed air usage $2,560 $2,750
WV0372 #07 Y:2007 Develop a repair/replace policy $3,550 $890
WV0372 #06 Y:2007 Establish a predictive maintenance program $5,074 $4,500
WV0372 #05 Y:2007 Utilize higher efficiency lamps and/or ballasts $5,593 $8,011
WV0372 #04 Y:2007 Recover waste heat from equipment $7,107 $540
WV0372 #03 Y:2007 Reduce illumination to minimum necessary levels $10,188 $511
WV0372 #02 Y:2007 Analyze flue gas for proper air/fuel ratio $13,813 $2,000
WV0372 #01 Y:2007 Utilize higher efficiency lamps and/or ballasts $28,998 $34,945
MI0162 #09 Y:2007 Reduce the pressure of compressed air to the minimum required $3,630 $40
MI0162 #08 Y:2007 Use optimum size and capacity equipment $5,419 $4,800
MI0162 #07 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $8,769 $1,210