Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,123

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0016 #01 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $60,322 $10,000
TT0016 #04 Y:2007 Recover waste heat from equipment $19,000 $19,750
TT0016 #03 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $21,553 $42,900
TT0016 #02 Y:2007 Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $5,929 $1,500
TT0016 #01 Y:2007 Optimize plant power factor $17,400 $50,000
MS0325 #07 Y:2007 Install compressor air intakes in coolest locations $318 $1,050
MS0325 #06 Y:2007 Utilize energy-efficient belts and other improved mechanisms $411 $1,800
MS0325 #05 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $1,772 $236
MS0325 #04 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $4,031 $7,308
MS0325 #03 Y:2007 Use waste heat from hot flue gases to preheat $6,992 $8,100
MS0325 #02 Y:2007 Repair and eliminate steam leaks $9,208 $156
MS0325 #01 Y:2007 Utilize higher efficiency lamps and/or ballasts $19,471 $24,719
IA0420 #08 Y:2007 Use most efficient type of electric motors $13,130 $2,824
IA0420 #07 Y:2007 Install / repair insulation on steam lines $14,440 $2,400
IA0420 #06 Y:2007 Make a practice of turning off lights when not needed $2,156 $600
IA0420 #05 Y:2007 Install occupancy sensors $881 $560
IA0420 #04 Y:2007 Recover waste heat from equipment $19,446 $1,000
IA0420 #03 Y:2007 Reduce the pressure of compressed air to the minimum required $5,179 $25
IA0420 #02 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $9,062 $1,000
IA0420 #01 Y:2007 Install compressor air intakes in coolest locations $5,339 $900