Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,673

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0340 #15 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $20,697 $37,793
SF0340 #14 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $70,597 $65,970
SF0340 #13 Y:2006 Use most efficient type of electric motors $4,410 $3,712
SF0340 #12 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $18,702 $15,428
SF0340 #11 Y:2006 Use waste heat from hot flue gases to preheat $21,896 $15,000
SF0340 #10 Y:2006 Modify refrigeration system to operate at a lower pressure $125,591 $80,000
SF0340 #09 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $23,910 $12,188
SF0340 #08 Y:2006 Install timers on light switches in little used areas $4,828 $1,892
SF0340 #07 Y:2006 Install / repair insulation on condensate lines $12,710 $4,246
SF0340 #06 Y:2006 Install / repair insulation on steam lines $6,921 $1,133
SF0340 #05 Y:2006 Cooling towers $14,070 $3,000
SF0340 #04 Y:2006 Install / repair insulation on condensate lines $155,963 $36,556
SF0340 #03 Y:2006 Repair and eliminate steam leaks $6,510 -
SF0340 #02 Y:2006 Repair and eliminate steam leaks $12,059 $320
SF0340 #01 Y:2006 Analyze flue gas for proper air/fuel ratio $13,354 -
SD0392 #04 Y:2006 Reduce the pressure of compressed air to the minimum required $1,970 -
SD0392 #03 Y:2006 Replace electrically-operated equipment with fossil fuel equipment $5,417 $17,500
SD0392 #02 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $7,991 $7,991
SD0392 #01 Y:2006 Utilize higher efficiency lamps and/or ballasts $14,246 $20,870
MZ0001 #05 Y:2006 Install / repair insulation on steam lines $3,915 $3,300