Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,673

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0232 #02 Y:2006 Utilize energy-efficient belts and other improved mechanisms $2,876 -
SU0232 #01 Y:2006 Reduce the pressure of compressed air to the minimum required $3,030 -
OK0728 #07 Y:2006 Begin a practice of predictive / preventative maintenance $2,500 -
OK0728 #06 Y:2006 Air condition only space necessary $6,517 $2,295
OK0728 #05 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $506 $430
OK0728 #04 Y:2006 Install compressor air intakes in coolest locations $5,034 $1,994
OK0728 #03 Y:2006 Recover waste heat from equipment $8,567 $34,652
OK0728 #02 Y:2006 Recover waste heat from equipment $75,048 $240,000
OK0728 #01 Y:2006 Reduce ventilation air $35,971 $12,184
BD0309 #09 Y:2006 Modify process to reduce material use/cost $54,288 $17,200
BD0309 #08 Y:2006 Recover and reuse cooling water $25,524 $60,000
BD0309 #07 Y:2006 Utilize higher efficiency lamps and/or ballasts $309 $475
BD0309 #06 Y:2006 Install occupancy sensors $653 $1,200
BD0309 #05 Y:2006 Recover waste heat from equipment $7,023 $1,880
BD0309 #04 Y:2006 Install compressor air intakes in coolest locations $809 $1,000
BD0309 #03 Y:2006 Reduce the pressure of compressed air to the minimum required $2,190 -
BD0309 #02 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $8,400 $1,800
BD0309 #01 Y:2006 Use radiant heater for spot heating $23,664 $27,472
AS0421 #03 Y:2006 Install efficient rectifiers $576 $15,000
AS0421 #02 Y:2006 Use filter and drying oven to reduce sludge volume $3,068 $1,500