3,673
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0740 #07 Y:2006 | 07 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $15,352 | $2,280 | |
| UD0740 #06 Y:2006 | 06 | 2006 | Use adjustable frequency drive or multiple speed motors on existing system | $15,847 | $52,400 | |
| UD0740 #05 Y:2006 | 05 | 2006 | Use photocell controls | $42,737 | - | |
| UD0740 #04 Y:2006 | 04 | 2006 | Use flue gases to heat process or service water | $45,101 | $17,030 | |
| UD0740 #03 Y:2006 | 03 | 2006 | Replace hydraulic / pneumatic equipment with electric equipment | $56,879 | $252,100 | |
| UD0740 #02 Y:2006 | 02 | 2006 | Replace existing chiller with high efficiency model | $107,569 | $256,000 | |
| UD0740 #01 Y:2006 | 01 | 2006 | Utilize higher efficiency lamps and/or ballasts | $65,164 | $258,960 | |
| SU0232 #15 Y:2006 | 15 | 2006 | Optimize plant power factor | $1,024 | $9,635 | |
| SU0232 #14 Y:2006 | 14 | 2006 | Install occupancy sensors | $651 | $2,039 | |
| SU0232 #13 Y:2006 | 13 | 2006 | Conserve energy by efficient use of vending machines | $517 | $1,545 | |
| SU0232 #12 Y:2006 | 12 | 2006 | Use waste heat from hot flue gases to preheat | $4,616 | $11,554 | |
| SU0232 #11 Y:2006 | 11 | 2006 | Reduce ventilation air | $12,512 | $26,994 | |
| SU0232 #10 Y:2006 | 10 | 2006 | Utilize controls to operate equipment only when needed | $8,585 | $9,380 | |
| SU0232 #09 Y:2006 | 09 | 2006 | Install compressor air intakes in coolest locations | $1,307 | $1,182 | |
| SU0232 #08 Y:2006 | 08 | 2006 | Keep boiler tubes clean | $2,880 | $1,534 | |
| SU0232 #07 Y:2006 | 07 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,647 | $583 | |
| SU0232 #06 Y:2006 | 06 | 2006 | Insulate bare equipment | $1,165 | $225 | |
| SU0232 #05 Y:2006 | 05 | 2006 | Pay bills on time to avoid late fees | $773 | - | |
| SU0232 #04 Y:2006 | 04 | 2006 | Use synthetic lubricant | $890 | - | |
| SU0232 #03 Y:2006 | 03 | 2006 | Change procedures / equipment / operating conditions | $1,612 | - |