Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,652

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0290 #14 Y:2005 Use closed cycle process to minimize waste water production $406 $450
BD0290 #13 Y:2005 Use closed cycle process to minimize waste water production $1,381 $700
BD0290 #12 Y:2005 Use evaporation to concentrate material $2,604 $2,500
BD0290 #11 Y:2005 Utilize higher efficiency lamps and/or ballasts $267 $265
BD0290 #10 Y:2005 Install fossil fuel make-up air unit $396 $750
BD0290 #09 Y:2005 Reduce the pressure of compressed air to the minimum required $429 -
BD0290 #08 Y:2005 Install occupancy sensors $530 $1,000
BD0290 #07 Y:2005 Install compressor air intakes in coolest locations $810 $1,000
BD0290 #06 Y:2005 Install timers on light switches in little used areas $2,597 $100
BD0290 #05 Y:2005 Utilize energy-efficient belts and other improved mechanisms $4,346 $2,325
BD0290 #04 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $6,855 $825
BD0290 #03 Y:2005 Use radiant heater for spot heating $7,323 $4,000
BD0290 #02 Y:2005 Recover waste heat from equipment $7,841 $9,598
BD0290 #01 Y:2005 Use most efficient type of electric motors $8,277 $15,080
WV0317 #13 Y:2005 Reduce illumination to minimum necessary levels $400 $240
WV0317 #12 Y:2005 Install compressor air intakes in coolest locations $761 $205
WV0317 #11 Y:2005 Install occupancy sensors $1,219 $2,680
WV0317 #10 Y:2005 Develop a repair/replace policy $1,435 $2,075
WV0317 #09 Y:2005 Use waste heat from hot flue gases to preheat $2,086 $2,295
WV0317 #08 Y:2005 Insulate bare equipment $4,285 $128