| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0483 #03 Y:2005 | 03 | 2005 | Meter recycled water (to reduce sewer charges) | $21,300 | $5,100 | |
| OR0483 #02 Y:2005 | 02 | 2005 | Direct warmest air to combustion intake | $24,290 | $4,400 | |
| OR0483 #01 Y:2005 | 01 | 2005 | Recover and reuse waste material | $21,624 | - | |
| WI0495 #09 Y:2005 | 09 | 2005 | Recharge batteries on during off-peak demand periods | $242 | $200 | |
| WI0495 #08 Y:2005 | 08 | 2005 | Make a practice of turning off lights when not needed | $322 | $150 | |
| WI0495 #07 Y:2005 | 07 | 2005 | Use waste heat from flue gases to heat space conditioning air | $1,135 | $1,500 | |
| WI0495 #06 Y:2005 | 06 | 2005 | Install compressor air intakes in coolest locations | $1,800 | $1,280 | |
| WI0495 #05 Y:2005 | 05 | 2005 | Reschedule plant operations or reduce load to avoid peaks | $2,165 | - | |
| WI0495 #04 Y:2005 | 04 | 2005 | Install automatic stack damper | $2,655 | $3,400 | |
| WI0495 #03 Y:2005 | 03 | 2005 | Lower temperature during the winter season and vice-versa | $3,320 | $360 | |
| WI0495 #02 Y:2005 | 02 | 2005 | Utilize higher efficiency lamps and/or ballasts | $14,256 | $32,760 | |
| WI0495 #01 Y:2005 | 01 | 2005 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $162,672 | $360,000 | |
| UU0085 #07 Y:2005 | 07 | 2005 | Insulate feedwater tank | $150 | $200 | |
| UU0085 #06 Y:2005 | 06 | 2005 | Install vinyl strip / high speed / air curtain doors | $390 | $1,300 | |
| UU0085 #05 Y:2005 | 05 | 2005 | Direct warmest air to combustion intake | $1,300 | $940 | |
| UU0085 #04 Y:2005 | 04 | 2005 | Use waste heat from hot flue gases to preheat | $3,090 | $21,620 | |
| UU0085 #03 Y:2005 | 03 | 2005 | Install compressor air intakes in coolest locations | $2,110 | $405 | |
| UU0085 #02 Y:2005 | 02 | 2005 | Lower temperature during the winter season and vice-versa | $3,960 | $600 | |
| UU0085 #01 Y:2005 | 01 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,550 | $1,110 | |
| BD0290 #15 Y:2005 | 15 | 2005 | Meter waste water | $728 | $250 |