Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,175

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0549 #02 Y:2003 Use adjustable frequency drive or multiple speed motors on existing system $16,739 $8,525
MA0549 #01 Y:2003 Replace electrically-operated equipment with fossil fuel equipment $32,668 $15,495
WV0287 #12 Y:2003 Install compressor air intakes in coolest locations $350 $200
WV0287 #11 Y:2003 Reduce the pressure of compressed air to the minimum required $754 $50
WV0287 #10 Y:2003 Utilize higher efficiency lamps and/or ballasts $906 -
WV0287 #09 Y:2003 Analyze flue gas for proper air/fuel ratio $1,482 $1,000
WV0287 #08 Y:2003 Use waste heat from hot flue gases to preheat $2,091 $1,770
WV0287 #07 Y:2003 Adjust burners for efficient operation $2,860 $250
WV0287 #06 Y:2003 Insulate bare equipment $2,932 $97
WV0287 #05 Y:2003 Eliminate or reduce compressed air usage $3,278 $280
WV0287 #04 Y:2003 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $6,353 $700
WV0287 #03 Y:2003 Reschedule plant operations or reduce load to avoid peaks $8,944 -
WV0287 #02 Y:2003 Shut off air conditioning in winter heating season $9,585 -
WV0287 #01 Y:2003 Insulate bare equipment $9,905 $479
SU0183 #09 Y:2003 Utilize higher efficiency lamps and/or ballasts $5,121 $25,260
SU0183 #08 Y:2003 Insulate glazing, walls, ceilings, and roofs $11,288 $16,817
SU0183 #07 Y:2003 Install occupancy sensors $483 $523
SU0183 #06 Y:2003 Recover waste heat from equipment $18,502 $12,517
SU0183 #05 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $1,191 $680
SU0183 #04 Y:2003 Install compressor air intakes in coolest locations $1,663 $502