Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,175

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TA0059 #03 Y:2003 Utilize higher efficiency lamps and/or ballasts $4,885 $7,671
TA0059 #02 Y:2003 Insulate glazing, walls, ceilings, and roofs $5,536 $500
TA0059 #01 Y:2003 Turn off equipment when not in use $9,950 -
LL0166 #08 Y:2003 Change rate schedules or other changes in utility service $55,292 -
LL0166 #07 Y:2003 Install occupancy sensors $917 $572
LL0166 #06 Y:2003 Reduce illumination to minimum necessary levels $967 $570
LL0166 #05 Y:2003 Use photocell controls $1,918 $492
LL0166 #04 Y:2003 Reduce the pressure of compressed air to the minimum required $7,286 $20
LL0166 #03 Y:2003 Insulate bare equipment $9,566 $3,733
LL0166 #02 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $16,855 $9,440
LL0166 #01 Y:2003 Install equipment to utilize waste fuel $100,695 $120,000
LE0159 #10 Y:2003 Install vinyl strip / high speed / air curtain doors $9,932 $37,964
LE0159 #09 Y:2003 Replace broken windows and/or window sash $8,620 $12,247
LE0159 #08 Y:2003 Reschedule plant operations or reduce load to avoid peaks $13,548 $2,500
LE0159 #07 Y:2003 Replace electrically-operated equipment with fossil fuel equipment $45,153 $100,000
LE0159 #06 Y:2003 Recover and reuse cooling water $1,286 $25,500
LE0159 #05 Y:2003 Use waste heat from hot flue gases to preheat $23,055 $13,500
LE0159 #04 Y:2003 Analyze flue gas for proper air/fuel ratio $4,620 -
LE0159 #03 Y:2003 Utilize energy-efficient belts and other improved mechanisms $1,945 -
LE0159 #02 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $9,138 $300