Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,175

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0290 #08 Y:2003 Reduce the pressure of compressed air to the minimum required $1,107 $300
WV0290 #07 Y:2003 Repair and eliminate steam leaks $2,228 $150
WV0290 #06 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $3,003 $100
WV0290 #05 Y:2003 Use waste heat from hot flue gases to preheat $3,244 $1,800
WV0290 #04 Y:2003 Utilize energy-efficient belts and other improved mechanisms $3,392 $8,050
WV0290 #03 Y:2003 Develop a repair/replace policy $7,121 $1,000
WV0290 #02 Y:2003 Utilize higher efficiency lamps and/or ballasts $8,220 $21,673
WV0290 #01 Y:2003 Reschedule plant operations or reduce load to avoid peaks $17,454 -
WI0466 #07 Y:2003 Install compressor air intakes in coolest locations $1,231 $740
WI0466 #06 Y:2003 Recover waste heat from equipment $1,755 $1,000
WI0466 #05 Y:2003 Reduce / eliminate use of disposable product $3,550 -
WI0466 #04 Y:2003 Use evaporation to concentrate material $4,435 $10,000
WI0466 #03 Y:2003 Replace city water with recycled water via cooling tower $4,749 $9,500
WI0466 #02 Y:2003 Install timers and/or thermostats $7,059 $1,200
WI0466 #01 Y:2003 Utilize higher efficiency lamps and/or ballasts $9,842 $30,850
MI0076 #06 Y:2003 Install automatic packing equipment $45,000 $23,400
MI0076 #05 Y:2003 Change rate schedules or other changes in utility service $3,834 $400
MI0076 #04 Y:2003 Modify storage space to avoid rental of a warehouse $3,936 $6,000
MI0076 #03 Y:2003 Analyze flue gas for proper air/fuel ratio $1,535 $1,370
MI0076 #02 Y:2003 Turn off equipment when not in use $2,032 $2,300