5,175
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LM0063 #04 Y:2003 | 04 | 2003 | Utilize energy-efficient belts and other improved mechanisms | $828 | $232 | |
| LM0063 #03 Y:2003 | 03 | 2003 | Do not use compressed air for personal cooling | $80 | $30 | |
| LM0063 #02 Y:2003 | 02 | 2003 | Utilize daylight whenever possible in lieu of artificial light | $2,129 | - | |
| LM0063 #01 Y:2003 | 01 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,244 | $140 | |
| AS0355 #08 Y:2003 | 08 | 2003 | Install automatic packing equipment | $3,492 | $22,000 | |
| AS0355 #07 Y:2003 | 07 | 2003 | Use most efficient type of electric motors | $161 | $211 | |
| AS0355 #06 Y:2003 | 06 | 2003 | Use / purchase optimum sized compressor | $2,083 | $200 | |
| AS0355 #05 Y:2003 | 05 | 2003 | Replace existing hvac unit with high efficiency model | $573 | $1,500 | |
| AS0355 #04 Y:2003 | 04 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $350 | $30 | |
| AS0355 #03 Y:2003 | 03 | 2003 | Reduce the pressure of compressed air to the minimum required | $210 | $15 | |
| AS0355 #02 Y:2003 | 02 | 2003 | Lower temperature during the winter season and vice-versa | $395 | - | |
| AS0355 #01 Y:2003 | 01 | 2003 | Utilize higher efficiency lamps and/or ballasts | $670 | $3,204 | |
| WV0269 #10 Y:2003 | 10 | 2003 | Recover waste heat from equipment | $36,459 | $6,156 | |
| WV0269 #09 Y:2003 | 09 | 2003 | Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $19,656 | $690 | |
| WV0269 #08 Y:2003 | 08 | 2003 | Install occupancy sensors | $3,716 | $350 | |
| WV0269 #07 Y:2003 | 07 | 2003 | Reduce illumination to minimum necessary levels | $4,081 | $230 | |
| WV0269 #06 Y:2003 | 06 | 2003 | Utilize higher efficiency lamps and/or ballasts | $19,374 | $23,821 | |
| WV0269 #05 Y:2003 | 05 | 2003 | Utilize higher efficiency lamps and/or ballasts | $2,528 | - | |
| WV0269 #04 Y:2003 | 04 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $858 | $250 | |
| WV0269 #03 Y:2003 | 03 | 2003 | Recover waste heat from equipment | $5,690 | $608 |