Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,175

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0432 #05 Y:2003 Optimize plant power factor $8,813 $8,813
OR0432 #04 Y:2003 Reduce the pressure of compressed air to the minimum required $10,230 $7,640
OR0432 #03 Y:2003 Analyze flue gas for proper air/fuel ratio $10,830 $1,200
OR0432 #02 Y:2003 Use most efficient type of electric motors $25,900 $32,000
OR0432 #01 Y:2003 Recycle spent tanning solution $136,000 $280,000
WI0446 #07 Y:2003 Install adequate dryers on air lines to eliminate blowdown $452 $400
WI0446 #06 Y:2003 Install compressor air intakes in coolest locations $945 $740
WI0446 #05 Y:2003 Upgrade controls on compressors $1,214 $3,500
WI0446 #04 Y:2003 Utilize energy-efficient belts and other improved mechanisms $2,093 $1,359
WI0446 #03 Y:2003 Analyze flue gas for proper air/fuel ratio $2,528 $500
WI0446 #02 Y:2003 Utilize higher efficiency lamps and/or ballasts $6,813 $15,675
WI0446 #01 Y:2003 Size electric motors for peak operating efficiency $20,491 $40,000
LE0161 #05 Y:2003 Reduce the pressure of compressed air to the minimum required $6,814 -
LE0161 #04 Y:2003 Insulate bare equipment $17,796 $6,000
LE0161 #03 Y:2003 Install compressor air intakes in coolest locations $1,357 $700
LE0161 #02 Y:2003 Install vinyl strip / high speed / air curtain doors $11,365 $3,000
LE0161 #01 Y:2003 Utilize energy-efficient belts and other improved mechanisms $585 -
AS0356 #12 Y:2003 Clear and rent existing space $96,000 $8,340
AS0356 #11 Y:2003 Lease / purchase baler; sell cardboard to recycler $4,280 $17,100
AS0356 #10 Y:2003 Air condition only space necessary $957 $4,260