Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,103

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0029 #04 Y:2001 Eliminate leaks in inert gas and compressed air lines/ valves $24,828 $3,000
IC0029 #03 Y:2001 Repair and eliminate steam leaks $10,646 $900
IC0029 #02 Y:2001 Use proper thickness of insulation on building envelope $9,300 $1,320
IC0029 #01 Y:2001 Insulate bare equipment $1,907 $3,610
GT0727 #08 Y:2001 Use most efficient type of electric motors $29,468 $321,854
GT0727 #07 Y:2001 Insulate bare equipment $147,500 $181,000
GT0727 #06 Y:2001 Replace heat treating oven with more efficient unit $679,000 $250,000
GT0727 #05 Y:2001 Use or replace with energy efficient substitutes $165,202 -
GT0727 #04 Y:2001 Redesign process $2,159,550 -
GT0727 #03 Y:2001 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $1,527,000 $4,140,000
GT0727 #02 Y:2001 Change rate schedules or other changes in utility service $1,807,000 -
GT0727 #01 Y:2001 Purchase gas directly from a contract gas supplier $563,200 $1,563,200
WI0414 #08 Y:2001 Utilize higher efficiency lamps and/or ballasts $754 $350
WI0414 #07 Y:2001 Install occupancy sensors $1,071 $2,400
WI0414 #06 Y:2001 Reschedule plant operations or reduce load to avoid peaks $1,971 -
WI0414 #05 Y:2001 Install vinyl strip / high speed / air curtain doors $2,560 $1,033
WI0414 #04 Y:2001 Improve air circulation with destratification fans / other methods $4,730 -
WI0414 #03 Y:2001 Eliminate leaks in inert gas and compressed air lines/ valves $4,225 -
WI0414 #02 Y:2001 Replace city water with recycled water via cooling tower $6,619 $14,000
WI0414 #01 Y:2001 Reduce space conditioning during non-working hours $13,469 $1,800