Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,103

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0204 #05 Y:2001 Install compressor air intakes in coolest locations $3,268 $2,000
BD0204 #04 Y:2001 Install occupancy sensors $3,761 $3,375
BD0204 #03 Y:2001 Use radiant heater for spot heating $5,276 $11,250
BD0204 #02 Y:2001 Reduce the pressure of compressed air to the minimum required $7,400 -
BD0204 #01 Y:2001 Use waste heat from hot flue gases to preheat $9,982 $2,000
MI0027 #05 Y:2001 Use optimum size and capacity equipment $6,727 $1,250
MI0027 #04 Y:2001 Recycle white water $2,639 $982
MI0027 #03 Y:2001 Modify startup/shutdown times $150,000 $3,900
MI0027 #02 Y:2001 Install or upgrade insulation on hvac distribution systems $1,410 $2,000
MI0027 #01 Y:2001 Reschedule plant operations or reduce load to avoid peaks $4,448 $1,859
IC0029 #14 Y:2001 Eliminate old stock and modify inventory control $102,000 $8,500
IC0029 #13 Y:2001 Modify workload $150,000 $32,000
IC0029 #12 Y:2001 Install occupancy sensors $962 $2,112
IC0029 #11 Y:2001 Utilize higher efficiency lamps and/or ballasts $1,182 $4,751
IC0029 #10 Y:2001 Utilize higher efficiency lamps and/or ballasts $4,519 $20,549
IC0029 #09 Y:2001 Utilize higher efficiency lamps and/or ballasts $14,753 $49,560
IC0029 #08 Y:2001 Use demand controller or load shedder $18,000 $3,280
IC0029 #07 Y:2001 Insulate bare equipment $1,616 $906
IC0029 #06 Y:2001 Use heat from boiler blowdown to preheat boiler feed water $36,712 $36,036
IC0029 #05 Y:2001 Analyze flue gas for proper air/fuel ratio $14,179 $1,500