Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,848

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0611 #10 Y:2000 Eliminate or reduce compressed air usage $1,345 $500
UD0611 #09 Y:2000 Minimize use of outside make-up air for ventilation except when used for economizer cycle $2,773 $700
UD0611 #08 Y:2000 Recover waste heat from equipment $4,371 $1,000
UD0611 #07 Y:2000 Utilize energy-efficient belts and other improved mechanisms $6,016 -
UD0611 #06 Y:2000 Train operators for maximum operating efficiency $12,096 -
UD0611 #05 Y:2000 Meter recycled water (to reduce sewer charges) $17,705 $3,000
UD0611 #04 Y:2000 Upgrade controls on compressors $23,249 $4,000
UD0611 #03 Y:2000 Use closed cycle process to minimize waste water production $29,561 $1,200
UD0611 #02 Y:2000 Replace existing equipment with more suitable substitutes $120,000 $95,750
UD0611 #01 Y:2000 Reduce scrap production $171,908 $100,000
WI0388 #08 Y:2000 Install spectral reflectors / delamp $190 -
WI0388 #07 Y:2000 Install timers and/or thermostats $336 $200
WI0388 #06 Y:2000 Utilize energy-efficient belts and other improved mechanisms $613 $562
WI0388 #05 Y:2000 Recover waste heat from equipment $1,265 $1,000
WI0388 #04 Y:2000 Eliminate leaks in inert gas and compressed air lines/ valves $1,411 $480
WI0388 #03 Y:2000 Install compressor air intakes in coolest locations $1,744 $1,580
WI0388 #02 Y:2000 Install equipment (eg compactor) to reduce disposal costs $2,134 -
WI0388 #01 Y:2000 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $10,705 $54,000
UM0182 #04 Y:2000 Recover waste heat from equipment $43,000 $100,000
UM0182 #03 Y:2000 Re-size charging openings or add movable cover or door $57,900 $28,900