Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,492

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0659 #06 Y:1999 Use computer programs to optimize hvac performance $45,013 $120,000
GT0659 #05 Y:1999 Utilize higher efficiency lamps and/or ballasts $9,706 $22,711
GT0659 #04 Y:1999 Install timers on light switches in little used areas $3,123 $400
GT0659 #03 Y:1999 Lease / purchase baler; sell cardboard to recycler $37,040 $10,000
GT0659 #02 Y:1999 Purchase gas directly from a contract gas supplier $3,484 -
GT0659 #01 Y:1999 Use fossil fuel powered generator during peak demand periods $88,180 $220,000
ME0285 #06 Y:1999 Minimize water usage $160 -
ME0285 #05 Y:1999 Install / repair insulation on steam lines $339 $600
ME0285 #04 Y:1999 Install / repair insulation on steam lines $706 $1,772
ME0285 #03 Y:1999 Install compressor air intakes in coolest locations $1,844 $300
ME0285 #02 Y:1999 Use only amount of packaging material necessary $3,500 -
ME0285 #01 Y:1999 Utilize higher efficiency lamps and/or ballasts $5,698 $16,582
SF0185 #10 Y:1999 Initiate a total quality management program $27,650 $130,000
SF0185 #09 Y:1999 Replace heat treating oven with more efficient unit $27,526 $28,000
SF0185 #08 Y:1999 Add equipment/ operators to reduce production bottleneck $15,600 $89,000
SF0185 #07 Y:1999 Separate and recycle scrap metal to foundry or for sale $848 -
SF0185 #06 Y:1999 Increase amount of waste recovered for resale $1,818 -
SF0185 #05 Y:1999 Reduce the pressure of compressed air to the minimum required $488 $2,166
SF0185 #04 Y:1999 Install occupancy sensors $1,208 $4,500
SF0185 #03 Y:1999 Utilize higher efficiency lamps and/or ballasts $4,017 $14,420