Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,079

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0137 #09 Y:1997 Install equipment (eg compactor) to reduce disposal costs $3,975 $11,000
WV0137 #08 Y:1997 Recover and reuse cooling water $1,307 $1,300
WV0137 #07 Y:1997 Recover waste heat from equipment $568 $840
WV0137 #06 Y:1997 Insulate bare equipment $1,532 $1,120
WV0137 #05 Y:1997 Use waste heat from hot flue gases to preheat $5,117 $1,875
WV0137 #04 Y:1997 Install outside air damper / economizer on hvac unit $527 $2,700
WV0137 #03 Y:1997 Insulate bare equipment $500 $290
WV0137 #02 Y:1997 Use most efficient type of electric motors $5,014 $11,290
WV0137 #01 Y:1997 Utilize energy-efficient belts and other improved mechanisms $554 $440
UD0539 #04 Y:1997 Increase amount of condensate returned $8,880 $15,000
UD0539 #03 Y:1997 Reschedule plant operations or reduce load to avoid peaks $39,482 -
UD0539 #02 Y:1997 Change rate schedules or other changes in utility service $1,296 -
UD0539 #01 Y:1997 Use flow control valves on equipment to optimize water use $2,210 $3,000
OR0316 #07 Y:1997 Use most efficient type of electric motors $1,142 $4,167
OR0316 #06 Y:1997 Reduce the pressure of compressed air to the minimum required $813 -
OR0316 #05 Y:1997 Turn off equipment during breaks, reduce operating time $1,410 -
OR0316 #04 Y:1997 Replace electrically-operated equipment with fossil fuel equipment $6,025 $31,400
OR0316 #03 Y:1997 Reduce illumination to minimum necessary levels $997 $2,560
OR0316 #02 Y:1997 Use fixtures to reduce machine changeout times $13,730 $9,350
OR0316 #01 Y:1997 Optimize plant power factor $1,044 $6,400