Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,079

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OD0085 #05 Y:1997 Use most efficient type of electric motors $1,327 $2,285
OD0085 #04 Y:1997 Analyze flue gas for proper air/fuel ratio $1,962 $1,495
OD0085 #03 Y:1997 Recover waste heat from equipment $1,915 $1,750
OD0085 #02 Y:1997 Eliminate leaks in inert gas and compressed air lines/ valves $1,568 $589
OD0085 #01 Y:1997 Utilize higher efficiency lamps and/or ballasts $2,532 $3,048
NC0113 #10 Y:1997 Eliminate old stock and modify inventory control $32,711 $56,000
NC0113 #09 Y:1997 Train operators for maximum operating efficiency $11,000 $10,500
NC0113 #08 Y:1997 Hire additional personnel to reduce changeout time $163,000 $8,000
NC0113 #07 Y:1997 Lease / purchase baler; sell cardboard to recycler $5,500 $5,200
NC0113 #06 Y:1997 Separate and recycle scrap metal to foundry or for sale $831 $500
NC0113 #05 Y:1997 Utilize higher efficiency lamps and/or ballasts $226 $1,400
NC0113 #04 Y:1997 Eliminate leaks in inert gas and compressed air lines/ valves $863 $210
NC0113 #03 Y:1997 Reduce the pressure of compressed air to the minimum required $252 $240
NC0113 #02 Y:1997 Revise smoke cleanup from operations $1,447 $3,400
NC0113 #01 Y:1997 Use / purchase optimum sized compressor $10,733 $15,000
UD0519 #05 Y:1997 Install equipment to move product $14,413 $6,000
UD0519 #04 Y:1997 Use demand controller or load shedder $811 -
UD0519 #03 Y:1997 Utilize higher efficiency lamps and/or ballasts $453 $888
UD0519 #02 Y:1997 Utilize higher efficiency lamps and/or ballasts $557 $1,915
UD0519 #01 Y:1997 Use gravity feeds wherever possible $9,099 $5,828