Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,079

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0105 #03 Y:1997 Close off unneeded steam lines $176 -
MS0105 #02 Y:1997 Air condition only space necessary $1,716 -
MS0105 #01 Y:1997 Use waste heat from hot flue gases to preheat $16,334 $5,000
OR0313 #06 Y:1997 Reduce illumination to minimum necessary levels $9,060 $2,670
OR0313 #05 Y:1997 Upgrade controls on compressors $7,486 $1,210
OR0313 #04 Y:1997 Replace existing equipment with more suitable substitutes $6,605 -
OR0313 #03 Y:1997 Eliminate/reduce an operation $627 -
OR0313 #02 Y:1997 Optimize production lot sizes and inventories $53,400 $18,750
OR0313 #01 Y:1997 Change procedures / equipment / operating conditions $59,850 $437
OD0102 #05 Y:1997 Regrind, reuse, or sell scrap plastic parts $6,840 -
OD0102 #04 Y:1997 Convert to aqueous cleaning system $2,106 $1,300
OD0102 #03 Y:1997 Eliminate leaks in inert gas and compressed air lines/ valves $3,629 $509
OD0102 #02 Y:1997 Utilize higher efficiency lamps and/or ballasts $11,455 $23,895
OD0102 #01 Y:1997 Use or replace with energy efficient substitutes $3,060 $9,300
HO0173 #09 Y:1997 Use demand controller or load shedder $1,463 -
HO0173 #08 Y:1997 Reschedule plant operations or reduce load to avoid peaks $19,788 $500
HO0173 #07 Y:1997 Consider use / purchase of bulk materials where possible $4,478 $500
HO0173 #06 Y:1997 Install / repair insulation on steam lines $492 $1,214
HO0173 #05 Y:1997 Use waste heat from hot flue gases to preheat $648 $1,073
HO0173 #04 Y:1997 Install occupancy sensors $2,983 $600