Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,630

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0198 #05 Y:1996 Replace existing hvac unit with high efficiency model $648 $700
AS0198 #04 Y:1996 Use most efficient type of electric motors $763 $2,805
AS0198 #03 Y:1996 Reduce the pressure of compressed air to the minimum required $1,181 -
AS0198 #02 Y:1996 Utilize higher efficiency lamps and/or ballasts $2,563 $7,630
AS0198 #01 Y:1996 Utilize higher efficiency lamps and/or ballasts $2,972 $5,673
WI0292 #06 Y:1996 Utilize energy-efficient belts and other improved mechanisms $254 -
WI0292 #05 Y:1996 Install compressor air intakes in coolest locations $366 $1,280
WI0292 #04 Y:1996 Utilize higher efficiency lamps and/or ballasts $416 $610
WI0292 #03 Y:1996 Reschedule plant operations or reduce load to avoid peaks $1,007 -
WI0292 #02 Y:1996 Install vinyl strip / high speed / air curtain doors $15,195 $2,297
WI0292 #01 Y:1996 Convert to high volume low pressure (hvlp) paint guns $15,413 $3,500
UL0176 #06 Y:1996 Re-arrange equipment layout to reduce handling costs $355,776 $77,600
UL0176 #05 Y:1996 Consider use / purchase of bulk materials where possible $9,373 $400
UL0176 #04 Y:1996 Purchase equipment instead of leasing $11,180 $4,500
UL0176 #03 Y:1996 Recycle waste ink and cleanup solvent $45,321 -
UL0176 #02 Y:1996 Use most efficient type of electric motors $136 $3,180
UL0176 #01 Y:1996 Utilize higher efficiency lamps and/or ballasts $802 $1,661
OR0292 #11 Y:1996 Eliminate/reduce redundant inspections $375,000 -
OR0292 #10 Y:1996 Replace old machine with new automatic multi-station tool $250,000 -
OR0292 #09 Y:1996 Use most efficient type of electric motors $4,215 $23,353