Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,667

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NV0018 #02 Y:1994 Utilize higher efficiency lamps and/or ballasts $194 $186
NV0018 #01 Y:1994 Use most efficient type of electric motors $3,017 -
KG0018 #05 Y:1994 Reduce the pressure of compressed air to the minimum required $89 $15
KG0018 #04 Y:1994 Install occupancy sensors $307 $195
KG0018 #03 Y:1994 Lower temperature during the winter season and vice-versa $370 -
KG0018 #02 Y:1994 Utilize controls to operate equipment only when needed $1,356 $450
KG0018 #01 Y:1994 Utilize higher efficiency lamps and/or ballasts $1,874 $699
WV0054 #07 Y:1994 Reduce scrap production $244,471 $36,720
WV0054 #06 Y:1994 Maintain air filters by cleaning or replacement $23,617 $15,458
WV0054 #05 Y:1994 Use synthetic lubricant $988 -
WV0054 #04 Y:1994 Analyze flue gas for proper air/fuel ratio $10,787 $1,000
WV0054 #03 Y:1994 Recover waste heat from equipment $2,306 $690
WV0054 #02 Y:1994 Eliminate leaks in inert gas and compressed air lines/ valves $2,161 $500
WV0054 #01 Y:1994 Utilize energy-efficient belts and other improved mechanisms $1,021 -
UL0119 #02 Y:1994 Utilize higher efficiency lamps and/or ballasts $477 $529
UL0119 #01 Y:1994 Eliminate leaks in inert gas and compressed air lines/ valves $1,280 $40
SF0050 #09 Y:1994 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $478,218 $653,645
SF0050 #08 Y:1994 Eliminate leaks in inert gas and compressed air lines/ valves $4,930 $900
SF0050 #07 Y:1994 Use heat from boiler blowdown to preheat boiler feed water $4,773 $25,000
SF0050 #06 Y:1994 Repair and eliminate steam leaks $401 $81