Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,667

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MO0119 #07 Y:1994 Reduce the pressure of compressed air to the minimum required $1,305 $25
MO0119 #06 Y:1994 Install compressor air intakes in coolest locations $2,151 $584
MO0119 #05 Y:1994 Utilize energy-efficient belts and other improved mechanisms $1,947 $335
MO0119 #04 Y:1994 Use most efficient type of electric motors $6,257 $9,222
MO0119 #03 Y:1994 Utilize higher efficiency lamps and/or ballasts $4,509 $710
MO0119 #02 Y:1994 Utilize higher efficiency lamps and/or ballasts $6,736 $12,820
MO0119 #01 Y:1994 Purchase gas directly from a contract gas supplier $15,785 $300
IA0087 #09 Y:1994 Apply for tax-free status for energy purchases $136 $250
IA0087 #08 Y:1994 Direct warmest air to combustion intake $593 $880
IA0087 #07 Y:1994 Eliminate leaks in inert gas and compressed air lines/ valves $890 $500
IA0087 #06 Y:1994 Reduce the pressure of compressed air to the minimum required $1,092 $400
IA0087 #05 Y:1994 Install occupancy sensors $1,843 $2,035
IA0087 #04 Y:1994 Utilize higher efficiency lamps and/or ballasts $2,432 $655
IA0087 #03 Y:1994 Upgrade obsolete equipment $11,900 $12,650
IA0087 #02 Y:1994 Replace city water with recycled water via cooling tower $19,667 $41,400
IA0087 #01 Y:1994 Purchase gas directly from a contract gas supplier $24,202 $11,700
HO0077 #05 Y:1994 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $221,968 $1,440,000
HO0077 #04 Y:1994 Air condition only space necessary $76,210 -
HO0077 #03 Y:1994 Use most efficient type of electric motors $716 $2,035
HO0077 #02 Y:1994 Utilize higher efficiency lamps and/or ballasts $2,374 $9,484