Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,667

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
ME0133 #01 Y:1994 Optimize plant power factor $2,688 $4,500
BD0009 #05 Y:1994 Purchase gas directly from a contract gas supplier $14,608 $1,500
BD0009 #04 Y:1994 Recover waste heat from equipment $226 $100
BD0009 #03 Y:1994 Install vinyl strip / high speed / air curtain doors $1,666 $1,430
BD0009 #02 Y:1994 Re-size charging openings or add movable cover or door $4,553 $5,412
BD0009 #01 Y:1994 Re-size charging openings or add movable cover or door $8,608 $12,904
AS0119 #07 Y:1994 Utilize higher efficiency lamps and/or ballasts $138 $140
AS0119 #06 Y:1994 Install occupancy sensors $295 $438
AS0119 #05 Y:1994 Utilize higher efficiency lamps and/or ballasts $9,018 $10,881
AS0119 #04 Y:1994 Turn off equipment during breaks, reduce operating time $469 $250
AS0119 #03 Y:1994 Use heat pump for space conditioning $3,935 $15,000
AS0119 #02 Y:1994 Close holes and openings in building such as broken windows $574 $700
AS0119 #01 Y:1994 Eliminate leaks in inert gas and compressed air lines/ valves $945 $350
AR0024 #06 Y:1994 Change rate schedules or other changes in utility service $724 -
AR0024 #05 Y:1994 Reschedule plant operations or reduce load to avoid peaks $9,986 -
AR0024 #04 Y:1994 Install compressor air intakes in coolest locations $154 $50
AR0024 #03 Y:1994 Utilize higher efficiency lamps and/or ballasts $4,118 $1,349
AR0024 #02 Y:1994 Utilize energy-efficient belts and other improved mechanisms $798 $974
AR0024 #01 Y:1994 Reduce illumination to minimum necessary levels $9,495 $210
UD0430 #07 Y:1994 Install / repair insulation on steam lines $645 $500